MacGregory Brook Trail Design & Shoreline Stabilization RFP

The City of Peekskill is requesting proposals from qualified consultants to prepare
full construction documents for an illuminated waterfront trail (~750 linear feet) with
soft stream bank stabilization techniques along the Hudson River and MacGregory
Brook in Riverfront Green Park . Design will utilize bioengineering techniques to
reduce erosion and address risks associated with climate change. The project will
implement the City’s Local Waterfront Revitalization Program and Southern
Waterfront Park and Trail Master Plan by enhancing Riverfront Green Park and
developing the final link in the City’s waterfront trail system.

The selected consultant will conduct site reconnaissance visits, develop draft
designs, conduct a public informational meeting, develop construction documents
(including electrical plans and technical specifications) for the selected design, and
apply for and acquire all required permitting and regulatory approvals for the
waterfront trail and shoreline stabilization improvements along the Hudson River
and MacGregory Brook in Riverfront Green Park.

The full RFP and accompanying documents can be found on the city’s website www.cityofpeekskill.com under the “Bids/RFP” tab.

RFP responses are due May 29, 2020 at 11AM to the City Clerk.